TGD H 2010 – 1.3.2.3 – Layout
1.3.2.3 Pipes should be laid to even gradients and any change of gradient should be combined with an access point (see paragraph 1.3.8.4
C:BCARTGDTGD hTGD%20H%202010TGD%20H%202010%20-%20SECTION%201%201.3.2.3.pdf
Posted on: December 21, 2015, by : admin