TGD L 2008 – 1.3.1 – Building Services, hEATInG PLAnT EFFICIEnCy

1.3.1 hEATInG PLAnT EFFICIEnCy Heating plant should be designed and installed so that it operates efficiently over the range of loading likely to be encountered. Oil and gas fired boilers should satisfy the efficiency requirements specified in S.I. No. 260 of 1994: European Communities (Efficiency requirements for new hot water boilers fired with liquid or gaseous fuels) Regulations, 1994.

C:BCARTGDtgd LTGD%20L%20NON%20DWELLINGS%20-%202008TGD%20L%20-%20NON%20DWELLINGS%202008%20-%20SECTION%201.3.1.pdf

Posted on: December 21, 2015, by : admin

Leave a Reply

Your email address will not be published. Required fields are marked *